The big picture: Michigan is home to about 10 million people and a big chunk of America's auto industry. Yet a new study estimates that a few hundred data centers scattered across the US used about as much electricity in a single year as that entire state. Strangely, no federal or state agency actually tracks that number, so researchers had to build their own list of these facilities, partly from satellite imagery.

The research, published on Monday in Nature Sustainability, comes from a Harvard-led team. It focuses only on hyperscale data centers – the largest class of facility, mostly run by cloud and AI giants. Operators and utilities aren't required to disclose how much power individual sites draw, so the team combined industry data with satellite checks to compile 403 facilities, then estimated what each consumed between May 2024 and April 2025.

Depending on how hard those sites were assumed to run, their combined usage landed somewhere between 68 and 99 terawatt-hours. The middle estimate of about 82 TWh works out to roughly 1.8% of all US electricity consumption. That upper figure, for comparison, is about what Michigan, Indiana or Tennessee each go through in a year.

Much of that load sits in Virginia. The state's 142 facilities alone use roughly a quarter of the total. Add Oregon, Ohio and Iowa, and those four states account for about half.

Those states run on very different grids, though. Oregon's sites draw on relatively clean power, while those in Virginia, Ohio and Iowa lean much harder on fossil fuels. Across the whole sample, more than half the electricity came from natural gas and coal. And because demand has ballooned so quickly, emissions from these facilities are now more than triple pre-AI-boom estimates.

The real total is probably higher, too, since the study didn't count electricity generated by on-site power plants or anything that came online after April 2025. Lead author Gianluca Guidi also told Wired that some of the campuses being proposed today are "substantially larger than the typical facility" his team looked at.

Those on-site plants have been multiplying fast. Developers stuck in years-long queues for grid connections have increasingly been turning to their own turbines and generators. In August, a Bloomberg analysis counted 99 proposed gas plants meant to power data centers directly. If they were to run at industry-standard rates, they would emit around 318 million metric tons of CO2 a year. That alone would push US power-sector emissions up by about 20%.